Installation of a self-consumption photovoltaic park for the Finsa factories in Cella (Teruel): Cella I, where the physical plant is installed, and Cella II, where the energy is delivered. The project includes the electrical interconnection between centres, necessary for self-consumption at a single point, with a nominal power of 2 MW and 2.31 MW of installed peak power.
The project involves the installation of 4,620 high-efficiency monocrystalline modules based on DUAL-PERC technology, with a unitary power of 500 Wp each and a tolerance between 0 and +3%.
The yield obtained, in terms of expected electricity production over the 25-year useful life of the facility, will be 102,054,977.04 kWh. The expected values for the indicators included in the low carbon economy axis of the 2014-2020 ERDF Operational Programme for Sustainable Growth (POCS) are: 381 toe, 22,184 tn CO2.
This project is part of the line of aid for low-carbon economy projects in renewable electricity generation facilities, co-financed by the European Regional Development Fund (ERDF) and managed by the IDAE, with the aim of achieving a cleaner and more sustainable economy. A way to make Europe.
Investment: €1,934,000
Financing: €190,000
File No.: FD-ELE-ARGC1-2020-000080